This $150,000 demolition project consisted of the removal of two 10,000 gallon steel condensate tanks and footings. Selective demolition included electrical conduits and water pipes without damaging the fully-operational existing boiler plant. Sitework included excavation, concrete footing removal, and backfilling with engineered-compacted fill to match the existing surrounding grade.