This Design-Build, $9M, 240 space solar-covered parking lot and electrical infrastructure project included demolition of existing lighting and small structures.
Sitework included grading, concrete curbs and sidewalks, pervious concrete, concrete equipment pads, and underground storm sewer.
Installed all structural steel including columns,
girders, and purlins.
Electrical infrastructure including underground electrical duct banks, three transformers with mediumvoltage switch gear and a complete 1.3 MW
photovoltaic solar system.